Item To Address |
By Whom |
When |
Status |
|
|
I. |
Projects Development Outline |
||||
|
General Site Information |
|||||
|
Address of Tract |
|||||
|
Legal Description |
|||||
|
Deed Restrictions |
|||||
|
Easements |
|||||
|
Site Location Map |
|||||
|
Current Property Owner |
|||||
|
Current Property Use |
|||||
|
Planned Property Use |
|||||
|
Property Area |
|||||
|
Property Dimensions |
|||||
|
Physical Characteristics: |
|||||
|
Topography |
|||||
|
Conditions |
|||||
|
Slope analysis |
|||||
|
Visibility analysis |
|||||
|
Circulation analysis |
|||||
|
Storm water drainage analysis |
|||||
|
Unique features (ravines/pits) |
|||||
|
Property Configuration |
|||||
|
Boundary limitations (acute angles, |
|||||
|
peninsula, frontage) |
|||||
|
Vehicular/Pedestrian Access |
|||||
|
Location, capacity and condition of roads, |
|||||
|
rail, transit and paths |
|||||
|
Geology and Soil |
|||||
|
Underlying geology, rock character and |
|||||
|
depth |
|||||
|
Soil type and depth, value as an engineering |
|||||
|
material and as a plant medium |
|||||
|
Fill, ledge, slides, subsidence |
|||||
|
Surface Water |
|||||
|
Existing water bodies (quantity and quality) |
|||||
|
Natural and man made drainage channels |
|||||
|
(flow, capacity, quality) |
|||||
|
Surface drainage pattern (amount, blockage, |
|||||
|
undrained depressions) |
|||||
|
Water table (elevation and fluctuation, |
|||||
|
springs) |
|||||
|
Floodplain |
|||||
|
Wetland |
|||||
|
Climate |
|||||
|
Regional data on variation of temperature, |
|||||
|
precipitation, humidity, solar angle, |
|||||
|
cloudiness, wind direction and force |
|||||
|
Microclimates: warm and cool slopes, air |
|||||
|
drainage, wind deflection and local breeze, |
|||||
|
shade, heat reflection and storage, plant |
|||||
|
indicators |
|||||
|
Sound levels, smell, atmospheric quality |
|||||
|
Ecology |
|||||
|
Dominant plant and animal communities- |
|||||
|
location and relative stability |
|||||
|
Protected plant and animal species and |
|||||
|
habitats |
|||||
|
Man-made Structures |
|||||
|
Buildings, walls, fences (location, historic |
|||||
|
significance, floor elevations, type, |
|||||
|
condition, use) |
|||||
|
Subsurface structures |
|||||
|
Archaeological Resources |
|||||
|
Plotting from historical and/or museum |
|||||
|
commissions |
|||||
|
Visual land forms |
|||||
|
Anticipated artifacts |
|||||
|
Surrounding Land Uses |
|||||
|
Character and relation |
|||||
|
Quality and variation of light, sound, air |
|||||
|
Potential hazards |
|||||
|
Neighbors - names and descriptions |
|||||
|
Historic On-Site Activities |
|||||
|
Prior development applications |
|||||
|
Previously removed structures and use |
|||||
|
Regional Architectural Character of Building |
|||||
|
Facades |
|||||
|
Structural configuration and scale |
|||||
|
Architectural details |
|||||
|
Type and relationship of material |
|||||
|
Texture and colors |
|||||
|
Relationship to landscaping |
|||||
|
Utilities - The location, capacity, future plans and contact person for: |
|||||
|
Water supply |
|||||
|
Sanitary sewer disposal |
|||||
|
Storm sewers |
|||||
|
Electric service |
|||||
|
Gas service |
|||||
|
Telephone service |
|||||
|
Cable TV |
|||||
|
Community Services and Facilities - The location, capacity, future plans and contact person for: |
|||||
|
Police |
|||||
|
Fire protection |
|||||
|
Street lighting |
|||||
|
Recreation |
|||||
|
Trash collection |
|||||
|
Snow removal |
|||||
|
Schools |
|||||
|
Emergency medical |
|||||
|
Mass transit |
|||||
|
Development Controls: |
|||||
|
Analyze both written ordinances and attitude toward development |
|||||
|
Legal Issues |
|||||
|
Political structure |
|||||
|
Contract persons |
|||||
|
Land use plans |
|||||
|
New highway plans |
|||||
|
Zoning controls |
|||||
|
Site design controls |
|||||
|
Easements |
|||||
|
Building codes |
|||||
|
Fire codes |
|||||
|
Life safety codes |
|||||
|
Health codes |
|||||
|
Conservation controls |
|||||
|
Highway controls |
|||||
|
Impact fees |
|||||
|
Local permits |
|||||
|
State permits |
|||||
|
Federal permits |
|||||
|
Off-site improvement policy |
|||||
|
Plan processing schedule |
|||||
|
Public and private intentions for future use of site |
|||||
|
II. |
Project Specification Outline |
||||
|
Division 1: General Conditions |
|||||
|
Building Type |
|||||
|
Size |
|||||
|
Ground Floor Area |
|||||
|
Supported Levels (No.) x Area/Level |
|||||
|
Below Grade Area |
|||||
|
Floor to Ceiling Height |
|||||
|
Design Criteria Live Loads: Roof |
|||||
|
Psf. End Walls |
|||||
|
Typical Bay Spacing |
|||||
|
Structural Frame |
|||||
|
Fireproofing |
|||||
|
Estimating |
|||||
|
Labor Market |
|||||
|
Bond |
|||||
|
Division 2: Sitework |
|||||
|
Demolition Site |
|||||
|
Topography |
|||||
|
Subsurface Exploration |
|||||
|
Site Area |
|||||
|
Clearing and Grubbing |
|||||
|
Topsoil |
|||||
|
Soil Type |
|||||
|
Rock |
|||||
|
Ground Water |
|||||
|
Bulk Excavation |
|||||
|
Backfill |
|||||
|
Building Excavation |
|||||
|
Storm Drains |
|||||
|
Building Sub Drains |
|||||
|
Temporary Erosion Control |
|||||
|
Water Supply |
|||||
|
Sewers |
|||||
|
Parking Area |
|||||
|
Curbs |
|||||
|
Parking Bumpers |
|||||
|
Painting Lines |
|||||
|
Guard Rail |
|||||
|
Sidewalk |
|||||
|
Steps |
|||||
|
Signs |
|||||
|
Traffic Signals |
|||||
|
Fencing |
|||||
|
Fountains |
|||||
|
Planters |
|||||
|
Playground Equipment |
|||||
|
Retaining Walls |
|||||
|
Lawns & Planting |
|||||
|
Division 3: Concrete |
|||||
|
Footings |
|||||
|
Underslab Fill |
|||||
|
Vapor Barrier |
|||||
|
Perimeter Insulation |
|||||
|
Slab on Grade |
|||||
|
Walls |
|||||
|
Stairs |
|||||
|
Division 4: Masonry |
|||||
|
Exterior Walls |
|||||
|
Interior Walls |
|||||
|
Face Brick |
|||||
|
Glazed Concrete Block |
|||||
|
Simulated Stone |
|||||
|
Division 5: Metals |
|||||
|
Design Criteria |
|||||
|
Structural System |
|||||
|
Corner Guards |
|||||
|
Expansion Joints |
|||||
|
Ladders |
|||||
|
Louvers |
|||||
|
Mat Frames |
|||||
|
Pipe Bumpers |
|||||
|
Railings |
|||||
|
Stairs |
|||||
|
Stair Treads |
|||||
|
Trench Covers |
|||||
|
Division 6: Carpentry |
|||||
|
Nailers |
|||||
|
Roof Trusses |
|||||
|
Sheathing |
|||||
|
Siding |
|||||
|
Cabinets |
|||||
|
Counter Tops |
|||||
|
Cupolas |
|||||
|
Door Trim |
|||||
|
Division 7: Moisture Protection |
|||||
|
Building Paper |
|||||
|
Caulking |
|||||
|
Control Joints |
|||||
|
Membrane Waterproofing |
|||||
|
Building Insulation |
|||||
|
Masonry Insulation |
|||||
|
Perimeter Insulation |
|||||
|
Roof Deck Insulation |
|||||
|
Shingles |
|||||
|
Aluminum |
|||||
|
Vinyl Siding |
|||||
|
Built Up Roofing |
|||||
|
Elastic Sheet Roofing |
|||||
|
Downspouts |
|||||
|
Expansion Joints |
|||||
|
Flashing |
|||||
|
Gutters |
|||||
|
Metal Roofing |
|||||
|
Soffit |
|||||
|
Roof Drains |
|||||
|
Roof Hatches |
|||||
|
Smoke Hatches |
|||||
|
Snow Guards |
|||||
|
Skylights |
|||||
|
Division 8: Doors, Windows & Glass |
|||||
|
Hollow Metal Frames |
|||||
|
Hollow Metal Doors |
|||||
|
Aluminum Frames |
|||||
|
Wood Doors |
|||||
|
Overhead Doors |
|||||
|
Rolling Doors Exterior |
|||||
|
Store Fronts |
|||||
|
Windows |
|||||
|
Finish Hardware |
|||||
|
Automatic Openers |
|||||
|
Automatic Operators |
|||||
|
Mirrors |
|||||
|
Division 9: Finishes |
|||||
|
Drywall Finishes |
|||||
|
Sound Deading Board |
|||||
|
Ceramic Tile |
|||||
|
Ceilings |
|||||
|
Carpet |
|||||
|
Resilient Floors |
|||||
|
Painting |
|||||
|
Wall Covering |
|||||
|
Division 10: Specialties |
|||||
|
Bathroom Accessories |
|||||
|
Fire Extinguishers |
|||||
|
Flagpoles |
|||||
|
Signs |
|||||
|
Division 11: Architectural Equipment |
|||||
|
Dock Equipment |
|||||
|
Food Service Equipment |
|||||
|
Parking Equipment |
|||||
|
Playground Equipment |
|||||
|
Special Equipment |
|||||
|
Division 12: Furnishings |
|||||
|
Blinds, Interior |
|||||
|
Floor Mats |
|||||
|
Division 13: Special Construction |
|||||
|
Division 14: Conveying Systems |
|||||
|
Division 15A: Plumbing |
|||||
|
Building Drainage |
|||||
|
Sanitary System |
|||||
|
Domestic Cold Water |
|||||
|
Domestic Hot Water |
|||||
|
Piping |
|||||
|
Insulation |
|||||
|
Fixtures |
|||||
|
Drinking Fountain |
|||||
|
Hose Bibb |
|||||
|
Lavatory |
|||||
|
Sinks |
|||||
|
Urinals |
|||||
|
Water Closets |
|||||
|
Division 15B: HVAC Systems |
|||||
|
Gas Supply System |
|||||
|
Heating Plant |
|||||
|
Cooling Plant |
|||||
|
Air Handling Units |
|||||
|
Distribution |
|||||
|
Insulation |
|||||
|
Division 15C: Fire Protection System |
|||||
|
Fire Protection |
|||||
|
Division 16: Electrical Systems |
|||||
|
Incoming Service |
|||||
|
Voltage |
|||||
|
Building Service: Size Amps |
|||||
|
Emergency System |
|||||
|
Telephone System |
|||||
|
Fire Alarm System |
|||||
|
Clock System |
|||||
|
Sound System |
|||||
|
Lighting Protection |
|||||
|
Lighting Fixtures |
|||||
|
Special Considerations |
|||||
|
At the onset of the project, the project team will review the "items to address" and agree upon responsibility and completion times |
|||||